Part 1 :

Table of contents

1 / INTRODUCTION

2 / EXAMPLE OF CIVIL WORKS FOR LANDING STATION

3 / EXAMPLE OF SUBDUCTING &PULLING OF CABLES

4 / OGB : SUPPLY & INSTALLATION ELECTRODES & EARTH PLATE

1 / INTRODUCTION

That document is to show some examples of our works done from many years for the land part installation – shore-end works & laying of optical submarine cable projects.

2 / EXAMPLE OF CIVIL WORKS FOR LANDING STATION

Project ORASCOM – ORAN :

ORASCOM-ORAN
Excavation of the site and starting construction of the retaining wall basement
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
Installation of the shelters
ORASCOM - ORAN
ORASCOM - ORAN
Site completed
ORASCOM-ORAN
Excavation of the site and starting construction of the retaining wall basement
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
ORASCOM - ORAN
Installation of the shelters
ORASCOM - ORAN
ORASCOM - ORAN
Site completed

3 / Example of subducting & pulling of cables

Project IMEWE – JEDDAH :

JEDDAH
Supply and installation of Subduct (50 + 40)
Preparation for cable pulling
JEDDAH
JEDDAH
Fixation of cable grip

3 / Example of subducting & pulling of cables

Project IMEWE – JEDDAH :

JEDDAH
Supply and installation of Subduct (50 + 40)
Preparation for cable pulling
JEDDAH
JEDDAH
Fixation of cable grip

Project SMW 3 – Macau :

JEDDAH
JEDDAH
Example of 8 digits for cable pulling
JEDDAH
JEDDAH

Project SMW 3 – Macau :

JEDDAH
JEDDAH
Example of 8 digits for cable pulling
JEDDAH
JEDDAH

4 / OGB :

Supply & installation electrodes

OGB
OGB
OGB
OGB

4 / OGB :

Project SMW 3 – macau :

OGB
OGB
OGB
OGB

Project SMW 3 – macau :

Installation Sea earth plate & Articulated Pipe on the beach

MACAU
MACAU
Beach trench & pulling earth plate cable inside the beach manhole
macau
MACAU
MACAU
MACAU
MACAU

Project SMW 3 – macau :

Installation Sea earth plate & Articulated Pipe on the beach

MACAU
MACAU
Beach trench & pulling earth plate cable inside the beach manhole
macau
MACAU
MACAU
MACAU
MACAU

Part 2 :

Table of contents

5 / CIVIL WORKS FOR DUCT ROUTE CONSTRUCTION

6 / EXEMPLE OF LANDDING OPERATION & SUB-RIVER WORKS

6 / CONCLUSION

5 / Civil works for duct route construction

Project ORASCOM – Oran :

Oran
ORAN
Construction of Beach Manhole
mise en place
mise en place
Construction of Beach Manhole
entretien
entretien
Construction of Beach Manhole End of seaward ducts

5 / Civil works for duct route construction

Project ORASCOM – Oran :

Oran
ORAN
Construction of Beach Manhole

Project TE North – Abu Talat

EGYPTE :

Abu-Talat EGYPTE
Construction of a beach manhole cover End of pipes to the sea
Abu-Talat EGYPTE
Lay out seaward ducts
Abu-Talat EGYPTE
Construction of the duct route

Project TE North – Abu Talat

EGYPTE :

Abu-Talat EGYPTE
Construction of a beach manhole cover End of pipes to the sea
Abu-Talat EGYPTE
Lay out seaward ducts
Abu-Talat EGYPTE
Construction of the duct route

Project TE North – Marseille

 France :

Marseille France
Project TE North - Marseille France
Construction of the duct route Installation of the HDD equipment
Project TE North - Marseille France
Project TE North - Marseille France
Project TE North - Marseille France
Project TE North - Marseille France
Preparation of HDPE pipes Soldering the 2 half segment of HDPE pipes
Project TE North - Marseille France
Project TE North - Marseille France
Project TE North - Marseille France
Project TE North - Marseille France
Pulling of FO cable
Project TE North - Marseille France
Project TE North - Marseille France
Put in place the perfabricated Beach Manhole
Project TE North - Marseille France
Project TE North - Marseille France

Project TE North – Marseille

France :

Construction of the duct route Installation of the HDD equipment
Start of the drilling
Preparation of HDPE pipes Soldering the 2 half segment of HDPE pipes
Subducting HDPE pipes
Pulling of FO cable
Put in place the perfabricated Beach Manhole
Installation of shelters for the landing station

Project Orascom – Oran :

Landing operation – Starting of pulling submarine cable
Recuperation of the cable
Installation of Articulated Pipes – End of seaward ducts

Project Orascom – Oran :

Project YLE D’YEU France
Landing operation – Starting of pulling submarine cable
Project YLE D’YEU France
Project YLE D’YEU France
Anchoring the S / M cable in BMH
Project YLE D’YEU France
Beach seal

Project ST LOUIS / SENEGAL :

Project ST LOUIS - SENEGAL
Loading the cable on the modular pontoon
Project ST LOUIS - SENEGAL
Project ST LOUIS - SENEGAL
Protection of the submarine cable with articulated cast iron pipes manufactured and supplied by WOCS

6 / Landing operation & subriver works

Project Cross River Gambia :

entretien
entretien
Preparation of the barage
Localisation of the faults at the Beach Manhole
geolocalisation
geolocalisation
Recuperation of the cable cut
Jointing reparation on the barge

7 / Conclusion

Following our experience, we can take in charge all the operations for the installation of the land part of submarine cable projects Or Backhaul cable :

  • Survey & Engineering for the coonstruction of duct route -landing station & network telecom link.

  • Study of the system earth (Ocean Ground Bed – OGB) : Resistivity measurement – soil study.

  • Supply Qualified jointing boxes for submarine or terrestril optical cable – earth or power cable Supply Electrodes & Installation.

  • Management of local contractor.

  • Installation and Jointing FO cables & copper cables Boxes.

  • Acceptance tests : All tests and controls to be performed on optical and copper land cables used at the land part of a submarine link or backhaul cable.

  • Shore-end works – Landing operations & Laying of sub-river cable, including supply & installation articulated pipes – burial by jeting up to 20 m water depth – video reporting.

  • Training Course.

  • Maintenance of existing link.